After positioning the ceiling channel within the angle profiles, connect it to the primary channels with connecting clips or channel intersect connectors. Ceiling channels should be cut to the appropriate length and mounted at right angles to the primary channels to create a grid around the ceiling.To connect them all, screw through the metal angle and the primary tube. Connect them with the metal angles that are hanging from the ceiling. Position them on top of the edge profiles, forming a C-shape. Cut them to fit – they should be 3 mm to 5 mm shorter than the length of the space, allowing them to slip easily into position. Install the primary channel profiles all the way across the space.Drill a hole through the two folded metal parts to allow the metal angle to be screwed into the existing roof. Create an incision along one side of the metal angle with the tin snips and fold in both ends. The length of the metal angles should be equal to the distance between the current roof and the edge channels.Trim the metal angles to the proper length. This will create a grid of the space, with the hanging metal angles positioned where the lines intersect. With a chalk line, connect these new marks. After measuring the length of the plasterboard panels, render marks on the two remaining walls in the room at the same distance as the panels’ length.This should be done between two opposing walls in the room. Repeat on the opposite wall, joining the two marks with a chalk line. Mark 1200 mm across from the wall and make a mark. These primary channels should be mounted at the same width as the plasterboard wall (usually 1200 mm). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |